lunes, 19 de enero de 2009

CONSTRUCTION BEGINS

Construction of the canal began on January 1 , 1882 , though digging at Culebra did not begin until January 22 , 1882 [2] . A huge labor force was assembled; in 1888, this numbered about 20,000 men, nine-tenths of these being afro-Caribbean workers from the West Indies . Although extravagant rewards were given to French engineers who joined the canal effort, the huge death toll from disease made it difficult to retain them — they either left after short service, or died. The total death toll between 1881 and 1889 was estimated at over 22,000.

Even as early as 1885, it had become clear to many that a sea-level canal was impractical, and that an elevated canal with locks was the best answer; however, de Lesseps was stubborn, and it was not until October 1887 that the lock canal plan was adopted.

By this time, however, the mounting financial, engineering and mortality problems, coupled with frequent floods and mudslides , were making it clear that the project was in serious trouble. Work was pushed forward under the new plan until May 1889, when the company became bankrupt, and work was finally suspended on May 15 , 1889 . After eight years, the work was about two-fifths completed, and some $234,795,000 had been spent.

The collapse of the company was a major scandal in France, and the role of two Jewish speculators in the affair enabled Edouard Drumont , an anti-semite , to exploit the matter. 104 legislators were found to have been involved in the corruption and Jean Jaurès was commissioned by the French parliament to conduct an inquiry into the matter, completed in 1893 [3] .

1 comentario:

Unknown dijo...

another article in this technical and deepen ups that
suffered construction.